Israel Solar Feed-in Tariff (2026)
For applications submitted in 2026 (Decision 70103), Israel's residential solar feed-in tariff is 0.48 ILS/kWh on the first 15 kW AC, fixed in nominal terms (before VAT) for 26 years from the distribution company's response. Applications must be submitted by 31 December 2026. For applications from 1 January 2027 to 31 December 2030, PUA Hearing 751 (October 2026) proposes a 5% annual reduction and a tariff period ending on 31 December 2047 for all new installations; it is a proposal, not a decision. This page lists all tiers, the alternative tracks and the urban premium.
Feed-in tariff tiers for photovoltaic installations whose application is submitted in 2026, per PUA Decision 70103 (13.1.2025). The tier is set by installed capacity as defined in criterion 175: the rated AC output of the inverters, not the DC rating of the panels. This is how Table 6.7-5 of the Tariff Book computes it. For a PV system combined with storage without a separate meter, criterion 175 sets installed capacity to the requested connection size, so the tier can change too; check the distribution company's response.
| Capacity band (AC) | Rate (ILS/kWh) | Rate (agorot/kWh) |
|---|---|---|
| First 15 kW | 0.4800 | 48.00 |
| 15-100 kW | 0.3731 | 37.31 |
| 100-300 kW | 0.3437 | 34.37 |
| 300-630 kW | 0.2844 | 28.44 |
The tiers are progressive: each capacity band is paid its own rate, so a large system receives a weighted average, not a single flat rate. The rates are nominal, before VAT, and are paid for 26 years from the distribution company's response.
Alternative Tracks for Small Systems (Decision 71004)
Instead of the regular tiers, a first and new installation at the consumption site can choose one of two tracks under Decision 71004 (in force since 14.8.2025), also for applications submitted by 31 December 2026:
- Accelerated payback (systems up to 30 kW): 60 agorot/kWh for the first 5 years on the first 15 kW. From year 6: 39.00 agorot for a system up to 15 kW, or 38.07 agorot on the first 15 kW of a 15-30 kW system (Table 6.7-5a). The part above 15 kW receives the regular tier in all years (37.31 agorot for 2026 applications).
- Real (CPI-linked) track (systems up to 15 kW): a base rate of 38.7 agorot/kWh, linked to the consumer price index and updated once a year.
Hearing 751 proposes extending both tracks to applications from 2027, with the same annual reduction. This is a proposal, not a decision.
Urban Premium
An additional 6 agorot/kWh for dual-use installations (on a roof or on an area that has another use) in the designated urban localities (Decision 66406, 6.9.2023). With a production meter it is paid on all the energy that meter records, including self-consumption; without a production meter, only on the energy exported to the grid (Decision 66406, Section 28). A production meter is mandatory above 15 kW. Paid until 31.12.2042 (Decision 66406, Section 37). The installation must receive the distribution company's response by 31.12.2026; submitting by that date is not enough. Under Hearing 751, an extension will be considered in a separate hearing, and would not cover storage.
The list of urban localities (67 in the original decision) covers localities that meet one of three criteria: an approved comprehensive master plan classifying them as model 1, 2 or 3 under National Master Plan 35, amendment 4; approved plans for more than 50,000 residents; or more than 50,000 residents according to the Central Bureau of Statistics. The list is updated in January and June, and eligibility follows the list on the application date. Later additions include Ofakim (Decision 70806) and Harish (Decision 74408, 24.6.2026).
System Cost on Self-Consumption
Self-consumed solar energy saves the purchase of that energy from the grid, but not the full consumption tariff. Under the common billing method ("payment for export"), the distribution company charges a system cost of 8.99 agorot/kWh before VAT on self-consumption (Tariff Book Tables 8.1-1 and 8.1-2, Decision 69305). It is computed each month on production minus export, never below zero. Without a production meter, production is normative: the inverter capacity times a monthly table (about 1,670 kWh per kW per year). SUNCAL's savings calculator deducts it.
Sources
- Tariff Book 07/2026 (gov.il)
- Decision 70103 (PUA, 13.1.2025)
- Decision 71004 (PUA, 14.5.2025, in force since 14.8.2025), accelerated and real tracks
- Criterion 175 and Tariff Book Table 6.7-5, installed capacity by inverter AC rating
- Decision 66406 (PUA, 6.9.2023), Urban premium; Decisions 70806 (Ofakim) and 74408 (Harish)
- Decision 69305 and Tariff Book Tables 8.1-1 and 8.1-2, system cost on self-consumption