Israel's complementary storage tariff tops up peak-hour feed-in to 134.24 agorot/kWh in summer and 93.20 in winter, for PV+battery systems up to 300 kW with the battery behind the same meter (no separate battery meter) (Decision 65304, as updated by Decision 68103). Eligibility requires more than 800 kWh per calendar year per kW of installed capacity, during peak hours. Under PUA Hearing 751 (October 2026, a proposal), the complementary tariff would not be extended: only installations that receive the distribution company's response before 1 January 2027 would keep it.

Complementary Storage Tariff

The complementary tariff (Decision 65304, updated January 2024, Decision 68103) compensates PV+storage systems for energy exported to the grid during peak hours. Values from Tariff Book 07/2026, Table 6.7-5:

SeasonRate (agorot/kWh)Peak hours
Summer (Jun-Sep)134.24Sun-Thu 17:00-23:00
Winter (Dec-Feb)93.20All days 17:00-22:00
TransitionFloor: 37.21Sun-Thu 17:00-22:00

Eligibility

  • Threshold: more than 800 kWh per calendar year per kW of installed capacity, during peak hours. For a PV system combined with storage without a separate meter, criterion 175 defines installed capacity as the requested connection size, as stated in the distribution company's response.
  • Which energy counts: the binding text (Decision 68103, as published in the official gazette and in the Tariff Book) counts energy "generated by the facility" in peak hours, while the explanatory notes of Decision 65304 refer to energy exported to the grid during peak hours. Confirm with the Israel Electric Corporation how the threshold is measured for your system. SUNCAL's storage calculator checks the threshold against the approved capacity you enter (default: the inverter's AC rating) and the energy exported to the grid during peak hours in the simulation.
  • The complementary tariff is paid as a top-up above the facility's base feed-in rate, on energy exported in peak hours, annually in January for the previous year.
  • PV system required (storage-only installations are not eligible), within the tariff regulation (criteria 175-176), up to 630 kW.
  • The battery is behind the same meter as the PV system, with no separate battery meter (AC or DC coupling).
  • Charging the battery from the grid is allowed only if approved in the distribution company's response (Decision 68103).
  • Fixed peak values (agorot/kWh, Tariff Book 07/2026, Table 6.7-5). Up to 300 kW: summer 134.24, winter 93.20, transition the higher of 37.21 or the system's own feed-in rate. 300-630 kW: summer 120.11, winter 83.39, transition the higher of 33.29 or the system's own rate. Since Decision 68103 these are fixed table values: they are the final values, and no further 5% or 15% reduction is applied to them.
  • For a home system at the 48 agorot feed-in rate, the top-up is 86.24 agorot/kWh in summer and 45.20 in winter, and nothing in the transition season.

Deadline

Under PUA Hearing 751 (published 18-19.10.2026), the complementary tariff would not be extended for new installations: only an installation that receives the distribution company's response before 1 January 2027 would keep it. This is a proposal, not yet a decision. Public comments are open until 10.11.2026 at 12:00.

Permits and Fire Safety

  • Storage up to 600 kWh is exempt from a building permit, with a height of up to 3 m and an area of up to 5 m² (Planning and Building exemption regulations, amendment in force since 22.8.2025). Above 600 kWh, a building permit is required.
  • Above 10 kWh: the system must comply with NFPA 855 (2023 edition), per the Fire and Rescue Authority directive of 12.11.2025, and the licensing authority must be notified (form B, within 45 days of completion).
  • Above 20 kWh: a safety engineer's approval is required, and form A must be submitted to the licensing authority at least 15 working days before installation.
  • Above 100 kWh: prior approval of the Fire and Rescue Authority.

Details (in Hebrew): permits and exemptions, battery fire safety.

Battery Without Solar

A battery without solar panels does not qualify for the complementary tariff. Under Decision 70104 (from 1 January 2026), a PV, PV+storage or storage-only installation of up to 8 MW for self-consumption, with no export to the grid and no other generation or storage facility at the connection point, can connect in a fast track. Up to 15 kW, registration is enough; above 15 kW, an operating permit from the Electricity Administration is also required. Check with the distribution company how this applies to your system.

Peak Windows (Decision 63609)

  • Summer (Jun-Sep): Sun-Thu 17:00-23:00
  • Winter (Dec-Feb): All days including Friday and Saturday, 17:00-22:00
  • Transition: Sun-Thu 17:00-22:00
  • In summer and transition, holidays and holiday eves are off-peak all day, like Fridays and Saturdays (Tariff Book Table 5.1-1).

Sources

  • Decision 65304 (PUA, 3.4.2023), Complementary tariff mechanism
  • Decision 68103 (PUA, 10.1.2024), Fixed complementary tariff values
  • PUA Hearing 751 (18-19.10.2026), proposal not to extend the complementary tariff
  • Decision 70104 (PUA), Fast-track connection from 1.1.2026
  • Planning and Building exemption regulations (amendment in force 22.8.2025); Fire and Rescue Authority directive of 12.11.2025 (NFPA 855, 2023 edition)
  • Decision 63609, TOU peak windows; Tariff Book Table 5.1-1
  • Criterion 175, installed capacity of a PV system combined with storage without a separate meter
  • Tariff Book 07/2026, Table 6.7-5 (gov.il)